Qualification
Campaigns.

Full qualification or acceptance test campaigns combining multiple test types in a coordinated sequence. We handle scheduling, documentation, and reporting — so you get a single test report that covers everything.

One project lead, one contract, one report. Vibration + thermal cycling already bundled into combined campaigns. TVAC and EMC integrating in 2026.

One coordination layer. Faster delivery.

Running tests as separate projects multiplies overhead. Qualification campaigns turn five contracts into one — same engineer, same plan, same report.

One timeline

Vibration → thermal → EMC scheduled as a single window. No gaps, no re-shipping hardware, no quote chains for each test.

One responsibility

One BSL engineer owns the campaign from kickoff to delivery. No handoffs between test labs. No “that’s a different team” excuses.

One report

Mission review boards get a single structured document covering the entire campaign. Not five PDFs to cross-reference.

How a campaign flows.

A representative qualification sequence, adjusted to your mission class and aligned with the launch provider’s requirements.

01

Inspection

02

Functional baseline

03

Vibration
(3-axis)

04

Thermal Vacuum

05

EMC / EMI

06

Final functional
+ Report

Order, levels, and dwell durations follow ECSS qualification or acceptance margins — confirmed in the test plan before kickoff. Functional verification is integrated throughout, not bolted on at the end.

Mission-ready deliverables.

Documentation prepared to meet the standards expected by review boards, launch providers, and qualification authorities responsible for flight qualification decisions.

Deliverable 01

Test Plan

Up-front document defining scope, levels, sequence, success criteria, and documentation requirements. Reviewed and signed by you before testing starts.

Deliverable 02

Test Procedures

Step-by-step procedures for each test in the sequence, including instrumentation, monitoring, and acceptance criteria. Repeatable. Auditable.

Deliverable 03

Test Report

Single structured report covering the full campaign. Anomaly log, environmental data, functional results, photographs, sign-off.

Deliverable 04

Raw Data Package

Time-series data from all monitoring channels — temperature, vibration, vacuum, electrical telemetry. Yours to keep, archive, and re-analyse.

Ready to scope your EMC campaign?

EMC capability is online in 2026. Tell us your launch date and integration environment — we’ll align the campaign window early.